ProRail begins one-year autonomous freight train testing on Betuweroute

DB Cargo Siemens Vectron locomotive with ProRail ATO branding on Betuweroute freight railway track in the Netherlands
© ProRail
The test phase began on 24 October 2025 at the Kijfhoek classification yard and is being conducted in cooperation with the Dutch and German Ministries of Infrastructure.

ProRail has started a year-long trial with Automatic Train Operation (ATO) on the Betuweroute freight corridor.

The test uses a DB Cargo locomotive equipped for ATO, operating with wagons of varying weight but without commercial cargo. The trial includes both GoA2 (semi-autonomous with driver supervision) and GoA4 (fully autonomous with remote monitoring), marking the first time these levels are tested in European freight rail under live conditions. The locomotive is also fitted with Remote Supervision & Control systems, and a test team is present in the cab throughout the trial.

© ProRail
© ProRail

The Betuweroute was selected due to its status as a dedicated freight corridor equipped with the European Train Control System (ERTMS) and no level crossings, creating a controlled environment for testing.

Expected outcomes from full deployment of ATO include a 20–30% increase in capacity on specific corridors under GoA4, up to 15% reduction in energy consumption, and operational cost savings of up to 20% due to improved driving patterns and reduced downtime.

After completion of the test phase, results will be evaluated and used for standardisation and certification efforts, with the long-term goal of deploying ATO technology more widely across corridors such as the Rhine-Alpine route.


加入我们的内部人士圈子:接收让您保持领先地位的每周摘要!

最新铁路新闻

首列窄轨氢动力列车亮相

施塔德勒公司和ARST公司共同推出了全球首款专为窄轨线路设计的氢动力列车,计划于2028年起在撒丁岛投入客运运营。

头条新闻

塞尔维亚铁路停运影响边境服务

在贝尔格莱德即将举行一场大规模反政府抗议活动之际,塞尔维亚暂停了全国范围内的铁路服务,这影响了国内交通以及与匈牙利的跨…