RCG: 600 additional container carrier wagons

RCG: 600 additional container carrier wagons
© ÖBB / Andreas Scheiblecker
RCG has signed a framework agreement with Swiss wagon hire company MFD Rail. Up to 600 additional container wagons will help shift even more freight from road to rail.

The 600 leased MFD Rail container carrier wagons are specifically tailored to RCG's needs and designed for use with the MOBILER configuration. In combination with the MOBILER's hydraulic lifting system, goods can be transferred between train and truck without the need for a crane or siding. The innovative logistics solution is also being used to transport waste by rail in an environmentally friendly way.

The first 100 newly produced container wagons have already arrived and are being used in various areas of waste management logistics. The next tranche is planned for 2024 and will include a further 100 specially branded container carrier wagons to be delivered to RCG in the first half of that year.

In 2023, more than 200,000 tonnes of waste have already been contracted in accordance with the amended Waste Management Act and will be transported by rail in a sustainable manner. 


加入我们的内部人士圈子:接收让您保持领先地位的每周摘要!

最新铁路新闻

头条新闻

塞尔维亚铁路停运影响边境服务

在贝尔格莱德即将举行一场大规模反政府抗议活动之际,塞尔维亚暂停了全国范围内的铁路服务,这影响了国内交通以及与匈牙利的跨…