Hector Rail wins a new multi-year contract with Södra

Hector Rail electric locomotives hauling freight train with cargo wagons on Swedish railway track near timber yard
© Hector Rail
The service covers rail transport of pulp and sawn timber between Södra’s facility in Värö and the port of Varberg in Sweden.

Hector Rail has been awarded a multi-year contract to operate Södra’s Väröpendel from 1 June 2026.

The assignment also includes contract shunting at both Värö and Varberg. No contract value or traffic volume was disclosed.

© Hector Rail
© Hector Rail

Väröpendel is part of Södra’s logistics chain for exports from Södra Cell Värö. The rail service links the production site with port handling in Varberg for onward shipment of forest industry products.

Hector Rail said the contract supports transport operations for the Swedish forest industry. Södra uses the Väröpendel for export flows where rail forms part of the terminal and port connection.


加入我们的内部人士圈子:接收让您保持领先地位的每周摘要!

最新铁路新闻

奥地利加强列车安保措施

奥地利联邦铁路公司(ÖBB)与奥地利内政部续签了铁路安全合作协议,将扩大联合巡逻、针对性警务行动以及员工培训的范围。

头条新闻