First test freight train arrives at Rijeka Gateway terminal

Blue ENNA freight locomotive with cargo container wagons on railway track at Rijeka Gateway terminal freight yard
© Rijeka Gateway
Rijeka Gateway has received its first test freight train as part of the terminal’s operational trials.

Operated by ENNA, the 500-metre train was divided into two compositions across two tracks and delivered empty containers for rail-mounted gantry (RMG) crane testing.

© Rijeka Gateway
© Rijeka Gateway

The arrival is the beginning of rail process trials at the new terminal, two years after the start of construction. The tests will assess the handling of rail freight under operational conditions and the integration of train operations into the wider container terminal workflow.


加入我们的内部人士圈子:接收让您保持领先地位的每周摘要!

最新铁路新闻

首列窄轨氢动力列车亮相

施塔德勒公司和ARST公司共同推出了全球首款专为窄轨线路设计的氢动力列车,计划于2028年起在撒丁岛投入客运运营。

头条新闻

塞尔维亚铁路停运影响边境服务

在贝尔格莱德即将举行一场大规模反政府抗议活动之际,塞尔维亚暂停了全国范围内的铁路服务,这影响了国内交通以及与匈牙利的跨…