Hector Rail wins a new multi-year contract with Södra

Hector Rail electric locomotives hauling freight train with cargo wagons on Swedish railway track near timber yard
© Hector Rail
The service covers rail transport of pulp and sawn timber between Södra’s facility in Värö and the port of Varberg in Sweden.

Hector Rail has been awarded a multi-year contract to operate Södra’s Väröpendel from 1 June 2026.

The assignment also includes contract shunting at both Värö and Varberg. No contract value or traffic volume was disclosed.

© Hector Rail
© Hector Rail

Väröpendel is part of Södra’s logistics chain for exports from Södra Cell Värö. The rail service links the production site with port handling in Varberg for onward shipment of forest industry products.

Hector Rail said the contract supports transport operations for the Swedish forest industry. Södra uses the Väröpendel for export flows where rail forms part of the terminal and port connection.


加入我们的内部人士圈子:接收让您保持领先地位的每周摘要!

最新铁路新闻

首列窄轨氢动力列车亮相

施塔德勒公司和ARST公司共同推出了全球首款专为窄轨线路设计的氢动力列车,计划于2028年起在撒丁岛投入客运运营。

头条新闻

塞尔维亚铁路停运影响边境服务

在贝尔格莱德即将举行一场大规模反政府抗议活动之际,塞尔维亚暂停了全国范围内的铁路服务,这影响了国内交通以及与匈牙利的跨…