New rail link supports construction flows to greater Paris

freight train with cargo wagons and container truck loading containers at rail terminal in France
© Western Quarries Society
A new rail service between Voutré (Mayenne) and Gennevilliers has been operational since April 2025.

Operated by Carrières de l’Ouest, the link responds to the logistics needs of construction works associated with the Greater Paris project. The route complements the existing rail connection to Bonneuil-sur-Marne.

Weekly container traffic for bulk aggregates  

Each week, a train consisting of 50 containers moves 1,500 tonnes of bulk construction materials from quarries in Voutré to the multimodal terminal in Gennevilliers, where Paris Terminal handles unloading operations. The cargo is intended for the supply of various Grand Paris job sites and is distributed the following day.

The same containers return to Mayenne filled with construction debris or other types of cargo.

Temporary operation until November 2025  

The Gennevilliers connection is scheduled to continue until November 2025. It is part of the operator’s extended network strategy, following the earlier establishment of combined flows toward Bonneuil-sur-Marne.

In parallel, rail freight volume from Voutré toward Bonneuil reached 960,000 tonnes in 2024, doubling the 2023 total. This result was enabled by the implementation of the Voutré Double Fret initiative.

The development supports the ongoing modal shift of construction-related freight flows in the Île-de-France region.


相关话题

加入我们的内部人士圈子:接收让您保持领先地位的每周摘要!

相关新闻

最新铁路新闻

木材运输重返法尔肯哈根

在停运约十年后,德国法尔肯哈根多式联运枢纽的铁路木材装载工作已恢复,目前已计划开行更多整列货运列车。

头条新闻